SERVICES
Installation of new laminate or hardwood flooring generally requires tearing out and removal of old carpet or flooring, and laying and fitting the new laminate floor. ‘HM Floor Covering’ can make this job easy, affordable, and result in elegant finish.
Steps involved in these projects:
- Removal of existing wall base or trims
- Clean, dry, and level the floor
- Install foam underlayment that provides soundproofing and makes comfortable for walking
- Laydown the laminates/hardwood
- Install end mouldings, T-mouldings and reducer strips to make functional transitions where required
- Install base mouldings along the walls that provide a decorative, finished appearance.
- Install trim mouldings to the wall or to the subfloor.
- Cleanup the floor, remove and haul away the debris.